Name: 220kV Transmission Line
Start Date: 2024
Status: Ongoing
The construction of the 220kV transmission line is a project that will enable the electrification of the Huambo and Huíla corridor by connecting the hydroelectric power plants, thereby creating a high-voltage grid configuration for the southern region.
This project will include 526 towers over a total length of 214 km, with assembly and erection works currently underway.