Name: Electrification of the Calulo Villages and South Conda
Start Date: 2024
Status: Ongoing
Client: ENDE-EP
The Electrification Project of the Villages of Calulo and South of Conda consists of the construction of a medium- and low-voltage network to supply the farms in Calulo, as well as low-voltage electrification in the villages, with around 1,000 poles planned.