60 kV Transmission Line – Kuito Catabola

Name: 60 kV Transmission Line – Kuito Catabola Start Date: 2023 Status: Completed Client: ENDE-EP This EPC-type project began in November 2023. It covers approximately 64 kilometres of transmission line using concrete poles.
Electrification of the Villages of Calulo and Sul da Conda

Name: Electrification of the Calulo Villages and South Conda Start Date: 2024 Status: Ongoing Client: ENDE-EP The Electrification Project of the Villages of Calulo and South of Conda consists of the construction of a medium- and low-voltage network to supply the farms in Calulo, as well as low-voltage electrification in the villages, with around 1,000 poles planned.
Construction of the 60 kV Cambambe–Calulo Overhead Line

Name: Construction of the Cambambe–Calulo 60 kV Overhead Line Start Date: 2018 Status: Completed Client: RNT The project for the construction of the Cambambe–Calulo 60 kV overhead line has a total length of 80 km.
Single-Circuit HV Line SE Ferrovia – SE Centralidade de Quilemba

Name: Single-Circuit HV Line SE Ferrovia – SE Centralidade de Quilemba Year: 2019 Client: OMATAPALO Status: Completed The single-circuit HV line between SE Ferrovia and SE Centralidade de Quilemba is part of the power transmission system, aimed at strengthening the distribution capacity in the region, ensuring greater supply stability, and supporting the growth of local communities and economic activities.